FRED MEYER - #242 Oregon City
Top power
3.7 kW
Plugs
2
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
2 plugs
Share
Embed this map
Paste this into your page. The map shows the live listing, and the link under it goes to the full page.
<iframe
src="https://chargealong.io/embed/3kwtvgsg/"
title="Map of FRED MEYER - #242 Oregon City, Oregon City OR"
width="100%"
height="300"
style="border:0"
loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/united-states/oregon/oregon-city/blink-charging/fred-meyer-242-oregon-city-3kwtvgsg/">FRED MEYER - #242 Oregon City, Oregon City OR</a></p>Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- MON: 24 hours | TUE: 24 hours | WED: 24 hours | THU: 24 hours | FRI: 24 hours | SAT: 24 hours | SUN: 24 hours
- Operator
- Blink Charging
- Last verified
- June 25, 2020Verified over 6 years before the source last saw it, so check before you rely on it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet.
More in Oregon City
Other chargers nearby
- Auto Town Buick GMC
EV Connect · 19495 SE MCLOUGHLIN BLVD, GLADSTONE OR 97027
3.5 miFast50 kW1 plugCCS1 - Danielson's Hilltop Mall
Blink Charging · 1500 Molalla Ave, Oregon City OR 97045
0.5 miAC3.7 kW2 plugsType 1 - Hilltop Collision Center
275 Beavercreek Rd, Oregon City OR 97045
0.6 miAC3.7 kW2 plugsType 1 - RED SOILS PSB MP 3-4
ChargePoint · 2051 Kaen Road, Oregon City OR 97045
0.7 miAC3.7 kW2 plugsType 1 - RED SOILS FD-4
ChargePoint · 150 S Beavercreek Rd, Oregon City OR 97045
0.7 miAC3.7 kW1 plugType 1 - RED SOILS FD-2
ChargePoint · 150 S Beavercreek Rd, Oregon City OR 97045
0.7 miAC3.7 kW1 plugType 1 - RED SOILS PSB 4
ChargePoint · 2051 Kaen Rd, Oregon City OR 97045
0.7 miAC3.7 kW2 plugsType 1
Source: Open Charge Map record 144079, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen October 4, 2026.