B3 LEVEL PARK B3 PARKING
Top power
3.7 kW
Plugs
2
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
2 plugs
Share
Embed this map
Paste this into your page. The map shows the live listing, and the link under it goes to the full page.
<iframe
src="https://chargealong.io/embed/mj272dw6/"
title="Map of B3 LEVEL PARK B3 PARKING, Chicago Loop IL"
width="100%"
height="300"
style="border:0"
loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/united-states/illinois/chicago-loop/chargepoint/b3-level-park-b3-parking-mj272dw6/">B3 LEVEL PARK B3 PARKING, Chicago Loop IL</a></p>Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Operator
- ChargePoint
- Last verified
- November 11, 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet.
More in Chicago Loop
Other chargers nearby
- The Aqua at Lakeshore East - Tesla Supercharger
Tesla · 225 North Columbus Drive, Chicago IL 60601
0.2 miFast50 kW10 plugsNACS (Tesla) - 530208 : University of Chicago Booth School of Business - Gleacher Center
Blink Charging · 450 North Cityfront Plaza Drive, Chicago IL 60611
0.1 miAC3.7 kW4 plugsType 1 - CFP II, LLC 204
ChargePoint · 240 E Illinois St, Chicago IL 60611
0.1 miAC3.7 kW2 plugsType 1 - Loews Chicago Hotel
Tesla · 455 N Park DR, Chicago IL 60611
0.1 miAC8 kW2 plugsNACS (Tesla) - OPTIMA LEVEL 3
ChargePoint · 220 E Illinois St, Chicago IL 60611
0.1 miAC3.7 kW2 plugsType 1 - Cityfront Place Garage - Floor 2 Right
Blink Charging · 400 N. McClurg Court, Chicago IL 60611
0.1 miAC3.7 kW1 plugType 1 - Cityfront Place Parking Garage
Blink Charging · 400 North McClurg Court, Chicago IL 60611
0.1 miAC3.7 kW4 plugsType 1
Source: Open Charge Map record 246889, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen October 4, 2026.