Greybill Building
Top power
50 kW
Plugs
2
Price
Not listed
Plugs
CCS1
CCS (Type 1) · DC
50 kW
1 plug
CHAdeMO
DC
50 kW
1 plug
Share
Embed this map
Paste this into your page. The map shows the live listing, and the link under it goes to the full page.
<iframe
src="https://chargealong.io/embed/c3l5yuat/"
title="Map of Greybill Building, San Miguel CA"
width="100%"
height="300"
style="border:0"
loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/united-states/california/san-miguel/evgateway/greybill-building-c3l5yuat/">Greybill Building, San Miguel CA</a></p>Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Operator
- EVGateway
- Last verified
- February 20, 2024Verified over 2 years before the source last saw it, so check before you rely on it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet.
More in San Miguel
Other chargers nearby
- La Quinta Inn & Suites by Wyndham Paso Robles
EV Range Charging Network · 2615 Buena Vista Dr, Paso Robles CA 93446
7.3 miUltra fast180 kW11 plugsCCS1, NACS (Tesla), Type 1 - Greybill Building
EVGateway · 1141 Mission Street, San Miguel CA 93451
0.5 miFast50 kW2 plugsCCS1, CHAdeMO - Stay on the Vineyard
7110 Drake Rd, Paso Robles CA 93446
3.8 miAC3.7 kW2 plugsType 1 - Paso Robles RV Ranch & Campground
398 Exline Rd, Paso Robles CA 93446
4.6 miAC1 kW1 plug - Vines on the Marycrest
Tesla · 5076 Mustard Creek RD, Paso Robles California 93446
5.5 miAC8 kW2 plugsNACS (Tesla) - CaliPaso Winery - Tesla
Tesla · 4230 Buena Vista Dr, Paso Robles CA 93446
6.2 miAC13 kW2 plugsNACS (Tesla)Free - CaliPaso Winery - Tesla Destination
Tesla · 4230 Buena Vista Dr, Paso Robles CA 93446
6.2 miAC3.7 kW2 plugsNACS (Tesla)
Source: Open Charge Map record 221850, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen October 4, 2026.