University of California - Davis - Lot 44
Top power
3.7 kW
Plugs
3
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
1 plug
Other
NEMA 5-20R · AC
1.9 kW
2 plugs
Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily; parking permit required; drivers must bring Level 1 cordset; Drivers must bring their own J1772 cordset for Level 1 charging
- Last verified
- November 11, 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet. Charged here recently? Let other drivers know.
Other chargers nearby
- Davis Commons
eVgo Network · 500 1st St, Davis CA 95616
0.8 miFast40 kW3 plugsCCS1, CHAdeMO, Type 1 - University of California - Davis - Lot 49
La Rue Rd and Garrod Dr, Davis CA 95616
0.3 miAC3.7 kW9 plugsType 1 - University of California - Davis - Lot 1
Hilgard Ln, Davis CA 95616
0.4 miAC3.7 kW18 plugsType 1 - University of California - Davis - Lot 27
Kleiber Hall Dr, Davis CA 95616
0.4 miAC3.7 kW3 plugsType 1 - University of California - Davis - Lot 56
426 Health Sciences Dr, Davis CA 95616
0.5 miAC3.7 kW2 plugsType 1 - University of California - Davis - Lot 25
760 Orchard Rd, Davis CA 95616
0.5 miAC3.7 kW16 plugsType 1 - University of California - Davis- Lot 55
Garrod Dr, Davis CA 95616
0.5 miAC3.7 kW2 plugsType 1
Source: Open Charge Map record 91418, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen September 13, 2026.