ChargeAlong
Sign in

Clean Energy - Los Angeles County Metropolitan Transportation Authority - Division 18

ACEV Connect · in Carson

No ratings yet

450 W Griffith St, Gardena CA 90745

Top power

3.7 kW

Plugs

1

Price

Not listed

Did it charge?

Plugs

Type 1

Type 1 (J1772) · AC

3.7 kW

1 plug

Directions
Apple MapsMaps app
33.85992, -118.28101

Share

RedditXFacebook
Embed this map

Paste this into your page. The map shows the live listing, and the link under it goes to the full page.

<iframe
  src="https://chargealong.io/embed/5hxmh4kw/"
  title="Map of Clean Energy - Los Angeles County Metropolitan Transportation Authority - Division 18, Carson CA"
  width="100%"
  height="300"
  style="border:0"
  loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/united-states/california/carson/ev-connect/clean-energy-los-angeles-county-metropolitan-transportation-authority-division-18-5hxmh4kw/">Clean Energy - Los Angeles County Metropolitan Transportation Authority - Division 18, Carson CA</a></p>

Price and access

Price
Not listed
Who can charge
Open to the public
Notes
24 hours daily
Operator
EV Connect
Last verified
June 25, 2020Verified over 6 years before the source last saw it, so check before you rely on it

Prices and access change. Check with the operator before you rely on this charger.

What drivers say

Nobody has said how it went yet.

Charged here? Say how it went

More in Carson

  • Every EV Connect charger in Carson
  • AC chargers in Carson
  • eVgo Network nearby
  • ChargePoint nearby
  • TurnOnGreen nearby
  • flo nearby

Other chargers nearby

Source: Open Charge Map record 121930, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen October 4, 2026.