ChargeAlong
Sign in

Tesco Head Office-Omega Building

ACPOD Point · in Cromer Hyde

No ratings yet

Shire Park, The Boulevard Hertfordshire AL7 1GB

Top power

7 kW

Plugs

4

Price

Free

Did it charge?

Plugs

Type 2

Type 2 (Socket Only) · AC

7 kW

4 plugs

Directions
Apple MapsMaps app
51.80965, -0.19537

Share

RedditXFacebook
Embed this map

Paste this into your page. The map shows the live listing, and the link under it goes to the full page.

<iframe
  src="https://chargealong.io/embed/6u4xkvvs/"
  title="Map of Tesco Head Office-Omega Building, Cromer Hyde ENG"
  width="100%"
  height="300"
  style="border:0"
  loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/united-kingdom/england/cromer-hyde/pod-point/tesco-head-office-omega-building-6u4xkvvs/">Tesco Head Office-Omega Building, Cromer Hyde ENG</a></p>

Price and access

Price
Free
As published
Free
Who can charge
Customers and staff
Operator
POD Point (UK)
Last verified
9 October 2023Verified over 2 years before the source last saw it, so check before you rely on it

Prices and access change. Check with the operator before you rely on this charger.

What drivers say

Nobody has said how it went yet.

Charged here? Say how it went

More in Cromer Hyde

  • Every POD Point charger in Cromer Hyde
  • AC chargers in Cromer Hyde
  • Osprey Charging nearby
  • Blink Charging nearby

Other chargers nearby

Source: Open Charge Map record 100546, data from Open Charge Map Contributors, Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0). Last seen 4 October 2026.