Camping Parc de la Péninsule
Top power
3.7 kW
Plugs
2
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
2 plugs
Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Operator
- flo
- Last verified
- 11 November 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet. Charged here recently? Let other drivers know.
Other chargers nearby
- BRCC - Sainte-Anne-de-la-Pérade - Ferme du Tarieu
Circuit Electrique · 705, 2e Av, Sainte-Anne-de-la-Pérade QC G0X 2J0
12 kmFast50 kW2 plugsCCS1, CHAdeMO - Bureau municipal - Sainte-Geneviève-de-Batiscan
Circuit Electrique · 30 rue St-Charles, Sainte-Geneviève-de-Batiscan QC G0X 2R0
2.5 kmAC3.7 kW1 plugType 1 - Bureau municipal - Sainte-Geneviève-de-Batiscan
Circuit Electrique · 30 rue St-Charles, Sainte-Geneviève-de-Batiscan QC G0X 2R0
2.5 kmAC3.7 kW1 plugType 1 - 35 de l'église - Sainte-Geneviève-de-Batiscan
Circuit Electrique · 30 Rue St-Charles, Sainte-Geneviève-de-Batiscan QC G0X 2R0
2.6 kmAC3.7 kW4 plugsType 1 - Parc de la rivière Batiscan
Circuit Electrique · 200 chemin du Barrage, St-Narcisse QC G0X 2Y0
3.5 kmAC3.7 kW1 plugType 1 - Parc de la rivière Batiscan
Circuit Electrique · 200 chemin du Barrage, St-Narcisse QC G0X 2Y0
3.5 kmAC3.7 kW1 plugType 1 - 630 Principale - St-Luc-de-Vincennes
Circuit Electrique · 630 rue Principale, St-Luc-de-Vincennes QC G0X 3K0
6.1 kmAC3.7 kW4 plugsType 1
Source: Open Charge Map record 378473, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen 13 September 2026.