Couche-Tard - Saint-Joseph-du-Lac, QC
Top power
50 kW
Plugs
2
Price
Not listed
Plugs
CCS1
CCS (Type 1) · DC
50 kW
1 plug
CHAdeMO
DC
50 kW
1 plug
Price and access
- Price
- Not listed
- Who can charge
- Open to the public, pay at the site
- Notes
- 24 hours daily Public - Credit card at all times
- Last verified
- 11 November 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
Something here out of date?
What drivers say
Nobody has said how it went yet. Charged here recently? Let other drivers know.
Other chargers nearby
- Electrify Canada - Premium Outlets Montreal
Electrify Canada · 19001 Chemin Notre-Dame, Mirabel QC J7J 0T1
20 kmUltra fast350 kW8 plugsCCS1, CHAdeMO - Desjardins - CdS St-Joseph-du-Lac
Circuit Electrique · 8, rue Laviolette, Saint-Joseph-du-Lac QC J0N 1M0
2.4 kmAC3.7 kW1 plugType 1 - Desjardins - CdS St-Joseph-du-Lac
Circuit Electrique · 8, rue Laviolette, Saint-Joseph-du-Lac QC J0N 1M0
2.4 kmAC3.7 kW1 plugType 1 - SÉPAQ - Parc national d'Oka
Circuit Electrique · 2020 chemin Oka, Oka QC J0N 1E0
5.3 kmAC3.7 kW1 plugType 1 - Sépaq-Parc National d'Oka
flo · 2020 chemin Oka, Oka QC J0N 1E0
5.3 kmAC7 kW1 plugType 1 - SÉPAQ - Parc national d'Oka - Stationnement Place communautaire
flo · 2020 chemin d'Oka, Oka QC J0N 1E0
5.4 kmAC3.7 kW2 plugsType 1 - SÉPAQ - Parc national d'Oka - Crèmerie
flo · 2020 chemin d'Oka, Oka QC J0N 1E0
5.5 kmAC3.7 kW6 plugsType 1
Source: Open Charge Map record 232709, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen 13 September 2026.