RECHARGECO GATINEAU 02
Top power
50 kW
Plugs
2
Price
Not listed
Plugs
CCS1
CCS (Type 1) · DC
50 kW
1 plug
CHAdeMO
DC
50 kW
1 plug
Share
Embed this map
Paste this into your page. The map shows the live listing, and the link under it goes to the full page.
<iframe
src="https://chargealong.io/embed/3vvdgom2/"
title="Map of RECHARGECO GATINEAU 02, Gatineau Southeast QC"
width="100%"
height="300"
style="border:0"
loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/canada/quebec/gatineau-southeast/chargepoint/rechargeco-gatineau-02-3vvdgom2/">RECHARGECO GATINEAU 02, Gatineau Southeast QC</a></p>Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Operator
- ChargePoint
- Last verified
- 11 November 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet.
More in Gatineau Southeast
Other chargers nearby
- Park+Charge - Loblaws Vanier
Park+Charge · 100 McArthur Ave, Ottawa ON K1L 8H5
9.4 kmUltra fast150 kW8 plugsCCS1, NACS (Tesla) - Parc Lac-Beauchamp
Circuit Electrique · 741 Boulevard Maloney Est, Gatineau QC J8P 7M4
1.8 kmAC3.7 kW2 plugsType 1 - Parc Lac-Beauchamp
Circuit Electrique · 741 Boulevard Maloney Est, Gatineau QC J8P 7M4
1.8 kmAC3.7 kW2 plugsType 1 - Oasis
flo · 37 boul Lorrain, Gatineau QC J8P 2C9
1.8 kmAC3.7 kW6 plugsType 1 - SWTCH Energy
SWTCH - Charge Everywhere · 150 Rue Jeannine-Gregoire-Ross, Gatineau QC J8P 0M6
3 kmAC3.7 kW3 plugsType 1 - STO - Centre d'Entretien et d'Exploitation
flo · 708 Boul. des Affaires, Gatineau QC J8R 3J8
3.5 kmAC3.7 kW8 plugsType 1 - Studio 157 - 348 Rue Main
Circuit Electrique · 348, Rue Main, Gatineau QC J8P 5K3
3.5 kmAC3.7 kW2 plugsType 1
Source: Open Charge Map record 283321, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen 4 October 2026.