Metro Hall
Top power
3.7 kW
Plugs
6
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
6 plugs
Share
Embed this map
Paste this into your page. The map shows the live listing, and the link under it goes to the full page.
<iframe
src="https://chargealong.io/embed/5hjjcsje/"
title="Map of Metro Hall, Downtown Toronto (Toronto Dominion Centre / Design Exchange) ON"
width="100%"
height="300"
style="border:0"
loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/canada/ontario/downtown-toronto-toronto-dominion-centre-design-exchange/unbranded/metro-hall-5hjjcsje/">Metro Hall, Downtown Toronto (Toronto Dominion Centre / Design Exchange) ON</a></p>Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Last verified
- 11 November 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
What drivers say
Nobody has said how it went yet.
More in Downtown Toronto (Toronto Dominion Centre / Design Exchange)
Other chargers nearby
- ImPark - Citibank Building
123 Front St W, Toronto ON M5J 2M3
500 mFast50 kW3 plugsCCS1, CHAdeMO - The Ritz-Carlton, Toronto
Tesla · 181 Wellington St W, Toronto ON M5V 3G7
100 mAC16 kW2 plugsNACS (Tesla) - Hotel le Germain - Toronto
Tesla · 30 Mercer St, Toronto ON M5V 1H3
200 mAC16 kW2 plugsNACS (Tesla) - FESTIVAL TOWER EV 3
ChargePoint · 5 Widmer St, Toronto ON M5V 1J9
200 mAC3.7 kW2 plugsType 1 - CINEMA TOWER EV 2
ChargePoint · 27 Widmer St, Toronto ON M5V 2E8
200 mAC3.7 kW1 plugType 1 - FLO - Cadillac Fairview - RBC Centre - P1 Level
flo · 155 Wellington Street West, Toronto ON M5V 3L3
200 mAC3.7 kW4 plugsType 1 - INDIGO PARK CTO019-04
ChargePoint · 320 Front St W, Toronto ON M5V 3B6
200 mAC3.7 kW2 plugsType 1
Source: Open Charge Map record 368953, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen 4 October 2026.