ChargeAlong
Sign in

THE POST P1 STALL 29

FastChargePoint · in Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown)

No ratings yet

658 Homer Street, Vancouver BC V6B 2R4

Top power

50 kW

Plugs

2

Price

Not listed

Did it charge?

Plugs

CCS1

CCS (Type 1) · DC

50 kW

1 plug

CHAdeMO

DC

50 kW

1 plug

Directions
Apple MapsMaps app
49.28047, -123.11352

Share

RedditXFacebook
Embed this map

Paste this into your page. The map shows the live listing, and the link under it goes to the full page.

<iframe
  src="https://chargealong.io/embed/ybg4c3yu/"
  title="Map of THE POST P1 STALL 29, Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown) BC"
  width="100%"
  height="300"
  style="border:0"
  loading="lazy"
></iframe>
<p><a href="https://chargealong.io/en/canada/british-columbia/vancouver-ne-downtown-harbour-centre-gastown-yaletown/chargepoint/the-post-p1-stall-29-ybg4c3yu/">THE POST P1 STALL 29, Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown) BC</a></p>

Price and access

Price
Not listed
Who can charge
Open to the public
Notes
24 hours daily
Operator
ChargePoint
Last verified
11 November 2025Verified 10 months before the source last saw it

Prices and access change. Check with the operator before you rely on this charger.

What drivers say

Nobody has said how it went yet.

Charged here? Say how it went

More in Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown)

  • Every ChargePoint charger in Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown)
  • Fast chargers in Vancouver (NE Downtown / Harbour Centre / Gastown / Yaletown)

Other chargers nearby

Source: Open Charge Map record 383162, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen 4 October 2026.