ChargeAlong
Sign in

CHAdeMO chargers in Farmington, UT

2 charging sites of the 8 in Farmington. The fastest is DAVIS COUNTY UT DCG WEST, 50 kW.

  • Fast

Other ways to narrow Farmington

AC (5)Fast (2)CCS1 (3)NACS (Tesla) (3)Type 1 (3)Chargepoint (4)Tesla (2)