SemaConnect chargers in Lents, OR
1 charging site of the 21 in Lents. The fastest is Southeast Campus, 3.7 kW.
- AC
- Southeast Campus
SemaConnect · 2305 Southeast 82nd Avenue, Portland OR 97216
AC3.7 kW4 plugsType 1
1 charging site of the 21 in Lents. The fastest is Southeast Campus, 3.7 kW.
SemaConnect · 2305 Southeast 82nd Avenue, Portland OR 97216