CPL-WOODLAND CPL WOODLAND 1
Top power
3.7 kW
Plugs
2
Price
Not listed
Plugs
Type 1
Type 1 (J1772) · AC
3.7 kW
2 plugs
Price and access
- Price
- Not listed
- Who can charge
- Open to the public
- Notes
- 24 hours daily
- Operator
- ChargePoint
- Last verified
- November 11, 2025Verified 10 months before the source last saw it
Prices and access change. Check with the operator before you rely on this charger.
Something here out of date?
What drivers say
Nobody has said how it went yet. Charged here recently? Let other drivers know.
Other chargers nearby
- Church Square
eVgo Network · 7949 Euclid Ave, Cleveland OH 44103
1.4 miUltra fast350 kW6 plugsCCS1, CHAdeMO - DLZ Corp - Cleveland
Blink Charging · 4208 Prospect Avenue East, Cleveland OH 44103
1.1 miAC3.7 kW2 plugsType 1 - Tri-C Metro Campus Lot 6
flo · 2900 Community College Ave, Cleveland OH 44115
1.1 miAC3.7 kW2 plugsType 1 - LINK 59 LINK 59 BUILDNG
ChargePoint · 6007 Euclid Ave, Cleveland OH 44103
1.2 miAC3.7 kW2 plugsType 1 - CLEVEFDN MCC 1
ChargePoint · 1975 E 65th St, Cleveland OH 44103
1.2 miAC3.7 kW2 plugsType 1 - CLEVEFDN MCC 2
ChargePoint · 1975 E 65th St, Cleveland OH 44103
1.2 miAC3.7 kW2 plugsType 1 - Baker Electric Building
7100 Euclid Ave, Cleveland OH 44103
1.2 miAC3.7 kW3 plugsType 1
Source: Open Charge Map record 282691, data from afdc.energy.gov, This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.. Last seen September 13, 2026.