ChargeAlong
Sign in

CCS2 chargers in Newmarket, Auckland

2 charging sites of the 8 in Newmarket. The fastest is BP Connect Newmarket, 75 kW.

  • Fast

Other ways to narrow Newmarket

AC (6)Fast (2)Type 1 (3)Type 2 (3)CHAdeMO (2)Unbranded (4)